Universities, TAFE & colleges · WA

Evacuation Diagrams for Universities, TAFE Campuses and Colleges in WA

Tertiary campuses change constantly: refurbished labs, new student hubs, temporary buildings and thousands of visitors who have never seen the site before. CMG produces and maintains evacuation diagrams for universities, TAFE campuses and colleges across WA, including regional campuses such as South Regional TAFE in Albany.
Evacuation diagrams prepared by CMG for Baldivis Gardens, Treeby and Applecross schools

Tertiary campuses

Lecture theatres, laboratories and student accommodation need more than a standard diagram

Laboratories need the diagram to show chemical spill kits, safety showers and isolation points alongside exits and extinguishers. Lecture theatres need diagrams at every exit, oriented for a crowd that moves in both directions. Student accommodation is sleeping accommodation and carries a higher duty.

CMG surveys campus by campus, holds the drawings on file and issues updates as buildings change, so the facilities team always has a current, dated set. Warden and extinguisher training can be delivered to campus security, faculty staff and residential advisors.

Real CMG diagrams

Diagrams installed on WA campuses

Diagrams CMG has drawn for TAFE and university campuses across WA, from Joondalup and Clarkson to South Hedland and Roebourne, each with the full campus address.

Trusted locally

Universities, TAFE and colleges that trust CMG

Every school here has had its evacuation diagrams designed by Craig and CMG. Their drawings are kept on file, so any update is quick.

North Metropolitan TAFE logo
The University of Western Australia logo

Interactive self-check

Is your evacuation diagram still compliant?

Six quick checks based on AS 3745-2010 and what Craig sees most often on WA sites.

Does every diagram have a "You Are Here" point that matches where it is mounted?AS 3745-2010 requires the diagram to be oriented to the viewer's position.

Are all current exits and paths of travel shown, with nothing that no longer exists?Blocked, locked or removed doors are the most common failure.

Is the assembly area shown correctly, including any temporary changes?Construction, transportables and new fencing often move it.

Is every extinguisher, hose reel, blanket and alarm point shown where it actually is?Equipment gets relocated during fit-outs and services.

Has the building changed since the diagram was issued?Extensions, new rooms, demountables or a changed use of space.

Is the diagram legible, with a legend, and mounted at the right height?Faded prints and missing legends are non-compliant.

Answer the six checks above

Takes under a minute. We will tell you plainly whether your diagrams are likely to stand up.

Good to know

Common questions

Straight answers grounded in AS 3745-2010 and WA workplace legislation. Anything else, call Craig.

Yes. Every WA workplace and facility occupied by people does, and tertiary campuses are also subject to the WHS (General) Regulations 2022.

Yes. CMG supplies PDFs and drawing references that slot into your asset register, and can align validity dates with your maintenance cycle.

Lab diagrams show spill kits, safety showers, eyewash stations and isolation points in addition to the standard elements, and CMG offers oil and chemical spill response training.

Where CMG already holds the drawings, updated diagrams are usually issued within days of receiving the revised floor plan.

Talk to Craig

Not sure your diagrams still match the building? Talk to Craig.

Tell Craig what has changed on site and he will tell you plainly whether your diagrams need updating, and quote only for what is actually needed.