Evacuation diagrams · Joondalup and the Northern Suburbs

Evacuation Diagrams in Joondalup and the Northern Suburbs

The northern corridor is where Perth is growing fastest, and new schools, childcare centres and business parks open every year from Joondalup through Wanneroo to Yanchep and Two Rocks. CMG has drawn and installed evacuation diagrams for schools in the area including Burns Beach Primary School and Yanchep Secondary College, and holds the drawings on file for quick updates as campuses expand.
Evacuation diagram prepared by CMG for Burns Beach Primary School

Local knowledge

New estates, transportables and growing campuses change fast

Northern suburbs schools add transportable classrooms almost every year and new estates reshape assembly areas and access roads. A diagram that was right at the start of the year can be wrong by term three. Craig surveys the site, draws every diagram to AS 3745-2010 and re-issues them as the campus changes.

Beyond schools, CMG works with childcare centres, medical practices, retail and the business parks around Joondalup, Wangara and Neerabup, all needing compliant diagrams under the WHS (General) Regulations 2022.

Real CMG diagrams

CMG diagrams in the northern suburbs and across WA

Eglinton Beach Primary, Ocean Reef Senior High, Burns Beach Primary and North Metropolitan TAFE in Joondalup and Clarkson, alongside CMG diagrams from across WA.

Recent local work

Recent CMG work in the northern suburbs

Craig has rolled out new and updated diagrams for schools and workplaces right across Perth’s north.

Evacuation diagram for Alkimos College by CMG Fire and Safety

Alkimos College

New evacuation diagrams designed and installed for the college in Perth’s northern growth corridor.

Evacuation diagram prepared by CMG for Burns Beach Primary School

Burns Beach Primary School

Evacuation diagrams designed and installed across the school in Perth’s northern suburbs.

Trusted locally

Local schools that trust CMG

Every school here has had its evacuation diagrams designed by Craig and CMG. Their drawings are kept on file, so any update is quick.

Alkimos College logo
Burns Beach Primary School logo
Connolly Primary School logo
Duncraig Senior High School logo
East Wanneroo Primary School logo
Greenwood Primary School logo
Kingsway Christian College logo
Kinross Primary School logo
Mindarie Senior College logo
Ocean Reef Senior High School logo
St Elizabeth's Catholic Primary School logo
St James' Anglican School logo
Yanchep Beach Primary School logo
Yanchep Rise Primary School logo
Beaumaris Primary School logo
Belridge Secondary College Education Support Centre logo
Sacred Heart College logo
Yanchep Secondary College logo

Interactive self-check

Is your evacuation diagram still compliant?

Six quick checks based on AS 3745-2010 and what Craig sees most often on WA sites.

Does every diagram have a "You Are Here" point that matches where it is mounted?AS 3745-2010 requires the diagram to be oriented to the viewer's position.

Are all current exits and paths of travel shown, with nothing that no longer exists?Blocked, locked or removed doors are the most common failure.

Is the assembly area shown correctly, including any temporary changes?Construction, transportables and new fencing often move it.

Is every extinguisher, hose reel, blanket and alarm point shown where it actually is?Equipment gets relocated during fit-outs and services.

Has the building changed since the diagram was issued?Extensions, new rooms, demountables or a changed use of space.

Is the diagram legible, with a legend, and mounted at the right height?Faded prints and missing legends are non-compliant.

Answer the six checks above

Takes under a minute. We will tell you plainly whether your diagrams are likely to stand up.

Good to know

Common questions

Straight answers grounded in AS 3745-2010 and WA workplace legislation. Anything else, call Craig.

Yes. CMG is based in Osborne Park and works across the whole of Western Australia. Joondalup, Wanneroo and the northern beaches are within 30 minutes of the CMG office.

Every workplace and facility occupied by people: schools, childcare centres, offices, shops, warehouses, aged care, medical practices, community centres and strata buildings, under AS 3745-2010 and the WHS (General) Regulations 2022.

Most sites are surveyed, drawn and installed within a few weeks, faster where CMG already holds the drawings. Ask Craig for a date that suits your site.

Whenever the building, exits, fire equipment or assembly area change. AS 3745-2010 says the validity period should not exceed five years, so Craig recommends a full review at least every five years. CMG reviews existing diagrams and updates only what needs it.

Talk to Craig

Not sure your diagrams still match the building? Talk to Craig.

Tell Craig what has changed on site and he will tell you plainly whether your diagrams need updating, and quote only for what is actually needed.