Evacuation diagrams · Stirling, Balcatta and Morley
Evacuation Diagrams in Stirling, Balcatta and Morley
- Trusted by 300+ WA schools
- 4.9★ Google rating, 85 reviews
- Stirling, Balcatta and Morley

Local knowledge
Home ground: fast turnaround for schools and businesses near Osborne Park
Being ten minutes away means a site survey, a re-check after a renovation or an urgent re-issue can happen quickly. Balcatta Senior High School is a good example of a large secondary campus with multi-storey blocks, specialist areas and a gymnasium, each needing its own correctly oriented diagrams.
Osborne Park and Balcatta are full of commercial premises, showrooms and workshops that need compliant diagrams under the WHS (General) Regulations 2022. CMG can combine diagrams with extinguisher and warden training in a single visit.
- Site survey and diagrams for every building and level
- Drawn to AS 3745-2010, oriented to where each one hangs
- Printed, framed or PDF, installed on site
- Drawings held on file for fast updates
- Warden, extinguisher and evacuation training on site
What Craig provides
For schools and workplaces in Stirling and Morley, CMG can cover the whole emergency management picture:
Real CMG diagrams
CMG diagrams in Stirling and Morley and across WA







Recent local work
Stirling, Balcatta and Morley schools CMG has looked after
Real CMG diagrams from schools in the area. Craig keeps every drawing on file, so updates are quick when a site changes.

Carine Primary School
A full set of 38 diagrams across Blocks A to E, the library, and the assembly, music and arts building.

Balcatta Senior High School
Evacuation diagrams across the senior high school campus.

West Morley Primary School
Framed evacuation diagrams installed at this Morley primary school.

Burbridge School, Koondoola
Zone-by-zone diagrams for this education support school, including the Pink Zone.

Durham Road School, Bayswater
Diagrams for the administration and staff room block, with the assembly area on the senior oval.

Sir David Brand School, Coolbinia
24 diagrams covering every area of this education support school, with assembly points at the bus bay and administration.
Trusted locally
Local schools that trust CMG
Every school here has had its evacuation diagrams designed by Craig and CMG. Their drawings are kept on file, so any update is quick.


















Interactive self-check
Is your evacuation diagram still compliant?
Six quick checks based on AS 3745-2010 and what Craig sees most often on WA sites.
Does every diagram have a "You Are Here" point that matches where it is mounted?AS 3745-2010 requires the diagram to be oriented to the viewer's position.
Are all current exits and paths of travel shown, with nothing that no longer exists?Blocked, locked or removed doors are the most common failure.
Is the assembly area shown correctly, including any temporary changes?Construction, transportables and new fencing often move it.
Is every extinguisher, hose reel, blanket and alarm point shown where it actually is?Equipment gets relocated during fit-outs and services.
Has the building changed since the diagram was issued?Extensions, new rooms, demountables or a changed use of space.
Is the diagram legible, with a legend, and mounted at the right height?Faded prints and missing legends are non-compliant.
Answer the six checks above
Takes under a minute. We will tell you plainly whether your diagrams are likely to stand up.
Good to know
Common questions
Straight answers grounded in AS 3745-2010 and WA workplace legislation. Anything else, call Craig.
Do you cover Stirling and Morley?
Yes. CMG is based in Osborne Park and works across the whole of Western Australia. Stirling, Balcatta, Morley and Osborne Park are within ten minutes of the CMG office.
Which buildings in Stirling and Morley need evacuation diagrams?
Every workplace and facility occupied by people: schools, childcare centres, offices, shops, warehouses, aged care, medical practices, community centres and strata buildings, under AS 3745-2010 and the WHS (General) Regulations 2022.
How quickly can you install diagrams in Stirling and Morley?
Most sites are surveyed, drawn and installed within a few weeks, faster where CMG already holds the drawings. Ask Craig for a date that suits your site.
When do diagrams in WA need to be updated?
Whenever the building, exits, fire equipment or assembly area change. AS 3745-2010 says the validity period should not exceed five years, so Craig recommends a full review at least every five years. CMG reviews existing diagrams and updates only what needs it.
Talk to Craig
Not sure your diagrams still match the building? Talk to Craig.
Tell Craig what has changed on site and he will tell you plainly whether your diagrams need updating, and quote only for what is actually needed.