Independent schools · Perth & WA

Evacuation Diagrams for Independent and Private Schools in WA

Independent schools often have some of the most complex school sites in WA: boarding houses, performing arts centres, aquatic facilities, chapels and new buildings opening every few years. CMG has worked with independent schools including Hale School and Christ Church Grammar School, and keeps their diagrams current as campuses change.
Compliant school evacuation diagram by CMG Fire and Safety on a dark smoke background

Complex campuses

Boarding houses, sports centres and multi-storey buildings each need their own diagram set

A boarding house is a sleeping accommodation building and needs diagrams at every level and exit. A performing arts centre needs diagrams for the auditorium, back of house and foyer. A sports centre with a pool needs assembly areas that make sense for a wet, barefoot crowd. CMG designs each diagram for the building and the people in it, not from a template.

For multi-campus schools CMG keeps one set of drawings and one register of every diagram, so your business manager or facilities team can see at a glance what was issued where and when, and what has changed since.

Real CMG diagrams

Diagrams installed across WA

Real CMG diagrams, including PLC Perth and Carey Baptist College, each drawn for its exact site and address.

Recent local work

Independent schools and colleges CMG has looked after

Multi-block campuses need a consistent set of diagrams across every building. Craig handles the lot.

Evacuation diagram for Al-Ameen College by CMG Fire and Safety

Al-Ameen College

Appointed to review and update the fire evacuation diagrams across the college’s blocks.

Trusted locally

Independent schools that trust CMG

Every school here has had its evacuation diagrams designed by Craig and CMG. Their drawings are kept on file, so any update is quick.

Carmel Adventist College logo
Christ Church Grammar School logo
Court Grammar School logo
Georgiana Molloy Anglican School logo
Hale School logo
John Wollaston Anglican Community School logo
Kalamunda Christian School logo
Kingsway Christian College logo
Living Waters Lutheran College logo
Regent College logo
St James' Anglican School logo
All Saints' College logo
Emmanuel Christian Community School logo
Kennedy Baptist College logo
St Hilda's Anglican School for Girls logo
St Mary's Anglican Girls' School logo
Presbyterian Ladies’ College logo
John Calvin Christian College logo
The King’s College logo

Interactive self-check

Is your evacuation diagram still compliant?

Six quick checks based on AS 3745-2010 and what Craig sees most often on WA sites.

Does every diagram have a "You Are Here" point that matches where it is mounted?AS 3745-2010 requires the diagram to be oriented to the viewer's position.

Are all current exits and paths of travel shown, with nothing that no longer exists?Blocked, locked or removed doors are the most common failure.

Is the assembly area shown correctly, including any temporary changes?Construction, transportables and new fencing often move it.

Is every extinguisher, hose reel, blanket and alarm point shown where it actually is?Equipment gets relocated during fit-outs and services.

Has the building changed since the diagram was issued?Extensions, new rooms, demountables or a changed use of space.

Is the diagram legible, with a legend, and mounted at the right height?Faded prints and missing legends are non-compliant.

Answer the six checks above

Takes under a minute. We will tell you plainly whether your diagrams are likely to stand up.

Good to know

Common questions

Straight answers grounded in AS 3745-2010 and WA workplace legislation. Anything else, call Craig.

Yes. As sleeping accommodation they carry a higher duty. Diagrams are needed at each level and near each exit, oriented to the viewer.

Yes. Surveys are done during holidays or around timetables, and installation is usually a single visit per building.

Send CMG the architectural floor plans and the diagrams are drawn before the building opens, then verified on site at handover.

Yes. Diagrams can carry the school crest and colours while keeping every element AS 3745-2010 requires.

Talk to Craig

Not sure your diagrams still match the building? Talk to Craig.

Tell Craig what has changed on site and he will tell you plainly whether your diagrams need updating, and quote only for what is actually needed.