Evacuation diagrams · Fremantle, Melville and South Perth
Evacuation Diagrams in Fremantle, Melville and South Perth
- Trusted by 300+ WA schools
- 4.9★ Google rating, 85 reviews
- Fremantle, Melville and South Perth

Local knowledge
Heritage buildings, large campuses and busy public venues
Applecross Senior High School is a large multi-block campus where every block needs its own diagram set, oriented correctly and showing the right assembly area. Fremantle heritage buildings often have unusual exits and shared stairwells that a template diagram gets wrong. CMG surveys each building rather than drawing from assumptions.
South Perth and Como medical practices, aged care and strata buildings need diagrams that work for visitors and residents with limited mobility, and CMG draws for the people in the building, not just the floor plan.
- Site survey and diagrams for every building and level
- Drawn to AS 3745-2010, oriented to where each one hangs
- Printed, framed or PDF, installed on site
- Drawings held on file for fast updates
- Warden, extinguisher and evacuation training on site
What Craig provides
For schools and workplaces in Fremantle and Melville, CMG can cover the whole emergency management picture:
Real CMG diagrams
CMG diagrams in Fremantle and Melville and across WA






Recent local work
Sites CMG has looked after around Fremantle and South Perth
A few of the local venues and schools Craig has reviewed and updated diagrams for recently.

Little Creatures Brewery, Fremantle
Updated diagrams for one of Fremantle’s highest-traffic venues, with assembly areas and routes drawn to AS 3745-2010.

Fremantle Arts Centre
Reviewed and updated diagrams for the historic 1860s building and its four-acre site, welcoming thousands of visitors a year.

Como Primary School
Reviewed and updated fire evacuation diagrams for this South Perth primary school.

Applecross Senior High School
Evacuation diagrams for the Applecross Senior High School campus.
Trusted locally
Local schools that trust CMG
Every school here has had its evacuation diagrams designed by Craig and CMG. Their drawings are kept on file, so any update is quick.















Interactive self-check
Is your evacuation diagram still compliant?
Six quick checks based on AS 3745-2010 and what Craig sees most often on WA sites.
Does every diagram have a "You Are Here" point that matches where it is mounted?AS 3745-2010 requires the diagram to be oriented to the viewer's position.
Are all current exits and paths of travel shown, with nothing that no longer exists?Blocked, locked or removed doors are the most common failure.
Is the assembly area shown correctly, including any temporary changes?Construction, transportables and new fencing often move it.
Is every extinguisher, hose reel, blanket and alarm point shown where it actually is?Equipment gets relocated during fit-outs and services.
Has the building changed since the diagram was issued?Extensions, new rooms, demountables or a changed use of space.
Is the diagram legible, with a legend, and mounted at the right height?Faded prints and missing legends are non-compliant.
Answer the six checks above
Takes under a minute. We will tell you plainly whether your diagrams are likely to stand up.
Good to know
Common questions
Straight answers grounded in AS 3745-2010 and WA workplace legislation. Anything else, call Craig.
Do you cover Fremantle and Melville?
Yes. CMG is based in Osborne Park and works across the whole of Western Australia. Fremantle, Melville and South Perth are within 25 minutes of the CMG office.
Which buildings in Fremantle and Melville need evacuation diagrams?
Every workplace and facility occupied by people: schools, childcare centres, offices, shops, warehouses, aged care, medical practices, community centres and strata buildings, under AS 3745-2010 and the WHS (General) Regulations 2022.
How quickly can you install diagrams in Fremantle and Melville?
Most sites are surveyed, drawn and installed within a few weeks, faster where CMG already holds the drawings. Ask Craig for a date that suits your site.
When do diagrams in WA need to be updated?
Whenever the building, exits, fire equipment or assembly area change. AS 3745-2010 says the validity period should not exceed five years, so Craig recommends a full review at least every five years. CMG reviews existing diagrams and updates only what needs it.
Talk to Craig
Not sure your diagrams still match the building? Talk to Craig.
Tell Craig what has changed on site and he will tell you plainly whether your diagrams need updating, and quote only for what is actually needed.