Evacuation diagrams · Albany and the Great Southern
Evacuation Diagrams in Albany and the Great Southern
- Trusted by 300+ WA schools
- 4.9★ Google rating, 85 reviews
- Albany and the Great Southern

Local knowledge
Regional schools and campuses deserve the same standard as Perth
Great Southern schools often combine older heritage buildings with new learning areas, and many have bushfire assembly areas as well as the standard fire assembly area. CMG diagrams show both, oriented to each location, with the legend and validity date the standard requires.
Because travel is involved, Craig groups Albany and Great Southern visits so schools, TAFE campuses, aged care and council buildings can be surveyed or trained in the same trip, keeping the cost down for each site.
- Site survey and diagrams for every building and level
- Drawn to AS 3745-2010, oriented to where each one hangs
- Printed, framed or PDF, installed on site
- Drawings held on file for fast updates
- Warden, extinguisher and evacuation training on site
What Craig provides
For schools and workplaces in Albany and the Great Southern, CMG can cover the whole emergency management picture:
Real CMG diagrams
CMG diagrams in Albany and the Great Southern and across WA







Recent local work
Recent CMG work in the Great Southern
Craig travels to regional WA regularly, grouping schools and sites so the trip is efficient for everyone.

Broomehill Primary School
Reviewed and updated fire evacuation diagrams for this Great Southern school.

North Albany Senior High School
Evacuation diagrams for this Great Southern senior high school campus.

Albany Secondary Education Support Centre
Diagrams for the centre’s administration building, with the assembly area at the bus bay.
Interactive self-check
Is your evacuation diagram still compliant?
Six quick checks based on AS 3745-2010 and what Craig sees most often on WA sites.
Does every diagram have a "You Are Here" point that matches where it is mounted?AS 3745-2010 requires the diagram to be oriented to the viewer's position.
Are all current exits and paths of travel shown, with nothing that no longer exists?Blocked, locked or removed doors are the most common failure.
Is the assembly area shown correctly, including any temporary changes?Construction, transportables and new fencing often move it.
Is every extinguisher, hose reel, blanket and alarm point shown where it actually is?Equipment gets relocated during fit-outs and services.
Has the building changed since the diagram was issued?Extensions, new rooms, demountables or a changed use of space.
Is the diagram legible, with a legend, and mounted at the right height?Faded prints and missing legends are non-compliant.
Answer the six checks above
Takes under a minute. We will tell you plainly whether your diagrams are likely to stand up.
Good to know
Common questions
Straight answers grounded in AS 3745-2010 and WA workplace legislation. Anything else, call Craig.
Do you cover Albany and the Great Southern?
Yes. CMG is based in Osborne Park and works across the whole of Western Australia. Craig schedules Great Southern trips several times a year and groups sites together to keep costs down.
Which buildings in Albany and the Great Southern need evacuation diagrams?
Every workplace and facility occupied by people: schools, childcare centres, offices, shops, warehouses, aged care, medical practices, community centres and strata buildings, under AS 3745-2010 and the WHS (General) Regulations 2022.
How quickly can you install diagrams in Albany and the Great Southern?
Most sites are surveyed, drawn and installed within a few weeks, faster where CMG already holds the drawings. Ask Craig for a date that suits your site.
When do diagrams in WA need to be updated?
Whenever the building, exits, fire equipment or assembly area change. AS 3745-2010 says the validity period should not exceed five years, so Craig recommends a full review at least every five years. CMG reviews existing diagrams and updates only what needs it.
Talk to Craig
Not sure your diagrams still match the building? Talk to Craig.
Tell Craig what has changed on site and he will tell you plainly whether your diagrams need updating, and quote only for what is actually needed.