Evacuation diagrams · Rockingham, Baldivis and Kwinana
Evacuation Diagrams in Rockingham, Baldivis and Kwinana
- Trusted by 300+ WA schools
- 4.9★ Google rating, 85 reviews
- Rockingham, Baldivis and Kwinana

Local knowledge
From new primary schools to the Kwinana industrial strip
Baldivis schools have grown block by block, with new wings and transportables arriving as enrolments climb. Each change means the You Are Here point, exits or assembly area on a diagram may no longer be right. CMG keeps the drawings and updates the set when the school tells us what has changed.
In Kwinana and East Rockingham, industrial sites need diagrams that show spill kits, isolation points and muster areas alongside exits and extinguishers, and CMG can deliver spill response and extinguisher training on the same visit.
- Site survey and diagrams for every building and level
- Drawn to AS 3745-2010, oriented to where each one hangs
- Printed, framed or PDF, installed on site
- Drawings held on file for fast updates
- Warden, extinguisher and evacuation training on site
What Craig provides
For schools and workplaces in Rockingham and Kwinana, CMG can cover the whole emergency management picture:
Real CMG diagrams
CMG diagrams in Rockingham and Kwinana and across WA







Recent local work
Rockingham, Baldivis and Kwinana schools CMG has looked after
Real CMG diagrams from schools in the area. Craig keeps every drawing on file, so updates are quick when a site changes.

Bungaree Primary School, Rockingham
Evacuation diagrams designed and installed for this Rockingham primary school.

Pine View Primary School, Baldivis
Diagrams for one of Baldivis’s newer primary schools, drawn to AS 3745-2010.

Baldivis Gardens Primary School
Block-by-block diagrams, including the Sandpiper Block, with the bushfire shelter-in-place building marked.
Trusted locally
Local schools that trust CMG
Every school here has had its evacuation diagrams designed by Craig and CMG. Their drawings are kept on file, so any update is quick.








Interactive self-check
Is your evacuation diagram still compliant?
Six quick checks based on AS 3745-2010 and what Craig sees most often on WA sites.
Does every diagram have a "You Are Here" point that matches where it is mounted?AS 3745-2010 requires the diagram to be oriented to the viewer's position.
Are all current exits and paths of travel shown, with nothing that no longer exists?Blocked, locked or removed doors are the most common failure.
Is the assembly area shown correctly, including any temporary changes?Construction, transportables and new fencing often move it.
Is every extinguisher, hose reel, blanket and alarm point shown where it actually is?Equipment gets relocated during fit-outs and services.
Has the building changed since the diagram was issued?Extensions, new rooms, demountables or a changed use of space.
Is the diagram legible, with a legend, and mounted at the right height?Faded prints and missing legends are non-compliant.
Answer the six checks above
Takes under a minute. We will tell you plainly whether your diagrams are likely to stand up.
Good to know
Common questions
Straight answers grounded in AS 3745-2010 and WA workplace legislation. Anything else, call Craig.
Do you cover Rockingham and Kwinana?
Yes. CMG is based in Osborne Park and works across the whole of Western Australia. Rockingham, Baldivis and Kwinana are regular stops for Craig and the team.
Which buildings in Rockingham and Kwinana need evacuation diagrams?
Every workplace and facility occupied by people: schools, childcare centres, offices, shops, warehouses, aged care, medical practices, community centres and strata buildings, under AS 3745-2010 and the WHS (General) Regulations 2022.
How quickly can you install diagrams in Rockingham and Kwinana?
Most sites are surveyed, drawn and installed within a few weeks, faster where CMG already holds the drawings. Ask Craig for a date that suits your site.
When do diagrams in WA need to be updated?
Whenever the building, exits, fire equipment or assembly area change. AS 3745-2010 says the validity period should not exceed five years, so Craig recommends a full review at least every five years. CMG reviews existing diagrams and updates only what needs it.
Talk to Craig
Not sure your diagrams still match the building? Talk to Craig.
Tell Craig what has changed on site and he will tell you plainly whether your diagrams need updating, and quote only for what is actually needed.