Evacuation diagrams · Midland and the Perth Hills
Evacuation Diagrams in Midland and the Perth Hills
- Trusted by 300+ WA schools
- 4.9★ Google rating, 85 reviews
- Midland and the Perth Hills

Local knowledge
Two assembly areas, steep sites and bushfire season
A hills school diagram usually carries two instructions: where to assemble for a fire in the building, and which building to shelter in during a bushfire. Getting both right, and oriented correctly from every mounting point, is what keeps staff calm when the alert comes through. CMG works with the school’s bushfire plan so the diagram and the plan agree.
Midland and Bellevue businesses, from the hospital precinct to light industry, need standard AS 3745-2010 diagrams and CMG can combine them with warden and extinguisher training.
- Site survey and diagrams for every building and level
- Drawn to AS 3745-2010, oriented to where each one hangs
- Printed, framed or PDF, installed on site
- Drawings held on file for fast updates
- Warden, extinguisher and evacuation training on site
What Craig provides
For schools and workplaces in Midland and the hills, CMG can cover the whole emergency management picture:
Real CMG diagrams
CMG diagrams in Midland and the hills and across WA







Recent local work
Perth Hills and Swan schools CMG has looked after
Real CMG diagrams from schools in the area. Craig keeps every drawing on file, so updates are quick when a site changes.

Mazenod College, Lesmurdie
Evacuation diagrams for this Catholic boys’ college in the Perth Hills.

Ballajura Community College
Block-by-block diagrams, including the Red Block, for this City of Swan secondary college.
Trusted locally
Local schools that trust CMG
Every school here has had its evacuation diagrams designed by Craig and CMG. Their drawings are kept on file, so any update is quick.




















Interactive self-check
Is your evacuation diagram still compliant?
Six quick checks based on AS 3745-2010 and what Craig sees most often on WA sites.
Does every diagram have a "You Are Here" point that matches where it is mounted?AS 3745-2010 requires the diagram to be oriented to the viewer's position.
Are all current exits and paths of travel shown, with nothing that no longer exists?Blocked, locked or removed doors are the most common failure.
Is the assembly area shown correctly, including any temporary changes?Construction, transportables and new fencing often move it.
Is every extinguisher, hose reel, blanket and alarm point shown where it actually is?Equipment gets relocated during fit-outs and services.
Has the building changed since the diagram was issued?Extensions, new rooms, demountables or a changed use of space.
Is the diagram legible, with a legend, and mounted at the right height?Faded prints and missing legends are non-compliant.
Answer the six checks above
Takes under a minute. We will tell you plainly whether your diagrams are likely to stand up.
Good to know
Common questions
Straight answers grounded in AS 3745-2010 and WA workplace legislation. Anything else, call Craig.
Do you cover Midland and the hills?
Yes. CMG is based in Osborne Park and works across the whole of Western Australia. Midland and the Perth hills are within 30 minutes of the CMG office.
Which buildings in Midland and the hills need evacuation diagrams?
Every workplace and facility occupied by people: schools, childcare centres, offices, shops, warehouses, aged care, medical practices, community centres and strata buildings, under AS 3745-2010 and the WHS (General) Regulations 2022.
How quickly can you install diagrams in Midland and the hills?
Most sites are surveyed, drawn and installed within a few weeks, faster where CMG already holds the drawings. Ask Craig for a date that suits your site.
When do diagrams in WA need to be updated?
Whenever the building, exits, fire equipment or assembly area change. AS 3745-2010 says the validity period should not exceed five years, so Craig recommends a full review at least every five years. CMG reviews existing diagrams and updates only what needs it.
Talk to Craig
Not sure your diagrams still match the building? Talk to Craig.
Tell Craig what has changed on site and he will tell you plainly whether your diagrams need updating, and quote only for what is actually needed.