Evacuation diagrams · Midland and the Perth Hills

Evacuation Diagrams in Midland and the Perth Hills

Midland, High Wycombe, Kalamunda and Mundaring sit on the bushfire interface, so schools and businesses in the hills need diagrams that show both the fire assembly area and the bushfire shelter in place building. CMG has worked with hills schools including High Wycombe Primary School and draws every diagram to AS 3745-2010 with WA bushfire planning in mind.
Evacuation diagram for Mazenod College science block by CMG Fire and Safety

Local knowledge

Two assembly areas, steep sites and bushfire season

A hills school diagram usually carries two instructions: where to assemble for a fire in the building, and which building to shelter in during a bushfire. Getting both right, and oriented correctly from every mounting point, is what keeps staff calm when the alert comes through. CMG works with the school’s bushfire plan so the diagram and the plan agree.

Midland and Bellevue businesses, from the hospital precinct to light industry, need standard AS 3745-2010 diagrams and CMG can combine them with warden and extinguisher training.

Real CMG diagrams

CMG diagrams in Midland and the hills and across WA

Bullsbrook College and Mazenod College, including bushfire safe building panels, alongside CMG diagrams from across WA.

Recent local work

Perth Hills and Swan schools CMG has looked after

Real CMG diagrams from schools in the area. Craig keeps every drawing on file, so updates are quick when a site changes.

Evacuation diagram for Mazenod College science block by CMG Fire and Safety

Mazenod College, Lesmurdie

Evacuation diagrams for this Catholic boys’ college in the Perth Hills.

Evacuation diagram prepared by CMG Fire and Safety for Ballajura Community College

Ballajura Community College

Block-by-block diagrams, including the Red Block, for this City of Swan secondary college.

Trusted locally

Local schools that trust CMG

Every school here has had its evacuation diagrams designed by Craig and CMG. Their drawings are kept on file, so any update is quick.

Brabham Primary School logo
Carmel Adventist College logo
Caversham Primary School logo
Caversham Valley Primary School logo
Eastern Hills Senior High School logo
Ellen Stirling Primary School logo
Good Shepherd Catholic School logo
High Wycombe Primary School logo
Holy Cross College logo
Kalamunda Christian School logo
Mary MacKillop Catholic Community Primary School logo
Mazenod College logo
Pickering Brook Primary School logo
St Brigid's College logo
Walliston Primary School logo
West Beechboro Primary School logo
Ashfield Primary School logo
Caversham Training & Education Centre logo
Cyril Jackson Senior Campus logo
Kiara College logo

Interactive self-check

Is your evacuation diagram still compliant?

Six quick checks based on AS 3745-2010 and what Craig sees most often on WA sites.

Does every diagram have a "You Are Here" point that matches where it is mounted?AS 3745-2010 requires the diagram to be oriented to the viewer's position.

Are all current exits and paths of travel shown, with nothing that no longer exists?Blocked, locked or removed doors are the most common failure.

Is the assembly area shown correctly, including any temporary changes?Construction, transportables and new fencing often move it.

Is every extinguisher, hose reel, blanket and alarm point shown where it actually is?Equipment gets relocated during fit-outs and services.

Has the building changed since the diagram was issued?Extensions, new rooms, demountables or a changed use of space.

Is the diagram legible, with a legend, and mounted at the right height?Faded prints and missing legends are non-compliant.

Answer the six checks above

Takes under a minute. We will tell you plainly whether your diagrams are likely to stand up.

Good to know

Common questions

Straight answers grounded in AS 3745-2010 and WA workplace legislation. Anything else, call Craig.

Yes. CMG is based in Osborne Park and works across the whole of Western Australia. Midland and the Perth hills are within 30 minutes of the CMG office.

Every workplace and facility occupied by people: schools, childcare centres, offices, shops, warehouses, aged care, medical practices, community centres and strata buildings, under AS 3745-2010 and the WHS (General) Regulations 2022.

Most sites are surveyed, drawn and installed within a few weeks, faster where CMG already holds the drawings. Ask Craig for a date that suits your site.

Whenever the building, exits, fire equipment or assembly area change. AS 3745-2010 says the validity period should not exceed five years, so Craig recommends a full review at least every five years. CMG reviews existing diagrams and updates only what needs it.

Talk to Craig

Not sure your diagrams still match the building? Talk to Craig.

Tell Craig what has changed on site and he will tell you plainly whether your diagrams need updating, and quote only for what is actually needed.